DESCRIPTION
Installed 300 m long sanitary line at 15′ depth as per EPCOR standards at PUSHA grounds Edmonton. Work also involved installing 6″ water line at 10′ depth and installing Hydrant close to building. All OHS regulations of shoring and excavation was fulfilled and line was camera tested before commissioning. Work involved installing 2 manholes up to 15′ depth.